The Wisconsin Department of Natural Resources (WDNR) issues an annual water system survey report for every municipality. The report requires cross connection compliance and, as such, mandates surveying.

But cross connection surveying is a tedious process and not without its share of headaches, particularly for those who lack the proper training or certifications. Frankly, it’s a job best left to outside experts. Kunkel Engineering Group’s team of cross connection surveyors are skilled, experienced, and most importantly, certified by the State of Wisconsin as experts in the field.

Cross connection compliance is vital to the long-term health and well-being of your community’s water system. We can make compliance efficient and cost-effective. Follow these three steps:

  1. Review your municipality’s DNR annual water system survey report.
  2. Tally the number of compliance surveys to be performed by the water utility.
  3. Call Kunkel Engineering Group at (920) 356-9447.

Other Services

____

Kunkel Engineering Group

Building Relationships that Build Communities™